the 2nd water meter
When we last night shortly before seven our bottom plate again a little visit made everyone, and it was pretty cold already, we asked ourselves for 3 minutes, the question: "Are we to the water meter at least wrap a blanket? " - With a look at the car thermometer this question but was summarily answered Nope (was yes to at least 3 ° C). But the next morning taught us one thing was better, now at the bottom plate transfer dripped the cabinet and the glass of water meter jump. (Makes 120, - € for a new water meter)-so Bargain! ;-) But if, and would help but nothing! If the new clock this evening nicely packed, which had `s hot now!
The construction manager and the head of Kohn were with the concrete of the floor plate very satisfied, unfortunately, been provided for this purpose crane location is too small, it is necessary that a road block her.
And one of our important information from the transfer: the expected control date is 14:12:09. Jo took the longest had!