Monday, November 1, 2010

Bushnell 4x12.40 Sportsman

is seen briefly twice the current level

Not that you think nothing happens to us, I have only just at the moment no time to write here.

Here's a quick update. We are located about 3-4 weeks before our plan to move. It is with great strides on the completion and at the moment are Renate and I more often at home than on the construction site.

We have had in the past few weeks a lot of help, especially Marla and Chris helped us a lot. The two have spent almost the entire fall break on our site. But thanks again!


also Isa and Thomas and Harald have helped us a lot to you thank you.

As it look now? The bathrooms are tiled and the basement even in part. The bath and shower and a toilet are installed, we have already.

The rooms upstairs are plastered and painted. The heater runs for several days.

We hope that by the end of next week, the tiles can be laid on the ground floor. Then, perhaps at the weekend the living room are papered. On 16
November is also supplied our staircase.

All in all, there is still much to do, but we are confident that this will hammer out a timely manner ..

Sun photos I will submit.

Sunday, September 19, 2010

Bart Chair Homer Back

joints and railings

And again is a lot happening with us. The plasterers are ready and the brick has been joined. The choice for a joint color we did not like that easily. On the one hand, provide bright joints is a contrast, on the other hand, we wanted to be first seen on the brick and then only at the joints. So rather darker joints. This is us (I think) did a good job. Anyway, we are very satisfied.
Then we have the weekend windows, mounted the railing in front of the soil depths, not that simple. But the railings look great, the investment in steel has been worth it.



goes in the next week it will continue the same: the floor is already installed and then comes in the screed.

Friday, September 10, 2010

Dust Throughout House From Pellet Stove

is how it

Here again some news from the site. The scaffolding is gone, so the house looks almost complete. Of course, only from the outside. But much has changed inside. It was now down the house wiring and electrical installation (before cleaning) is also ready. The bathroom is all from brick and the drywall was already there and has covered the floor. to plaster the moment isthe plasterers just about the floor, the entire cleaning work is expected to be completed Tuesday. Then the floor is clean and then have the screed.










I was too busy and have dealt with the attic conversion. The insulation and the film is currently in it and I get straight to the battening for the gypsum-cardboard plates.